So thanks to some initiative from Trish, we finally have the master bathroom useable.
She had ordered some peel-and-stick floor tiles for the area under the toilet. Then we installed a new ring, sat the toilet in place, and tightened it down.
The sink was pretty simple: the pedestal needed to be put in place and water supply lines connected.
There's still a little work to be done on the tub (slow draining). and that'll be it.
Another room added!
Wednesday, July 22, 2020
Tuesday, July 14, 2020
Office Setup (finally)
So, after the last month of doing my work (aka/Real Job) on the dining room table, we finally started getting to work on the office. The desk anyway - the rest will follow after we start unpacking boxes.
We moved the frame for the desk up late last week, and then like an idiot, I couldn't remember how it went back together. Between the two of us, we figured it out Monday and had it all assembled. Now to get the desktop here from the old house.
I recruited a couple of friends (Jay and Ted) along with Jay's truck to tackle this part of the project. So late Monday afternoon we muscled it out of one house and into the other.
Tuesday morning I got it all put together and standing, then moved my temporary office from the dining room to where it will now live - FOREVER!
Glad to get this part done.
Subscribe to:
Posts (Atom)